Mazze deep dive
Updated 2026-11-19.
Mazze is a proof-of-work Layer 1 built on a DAG (blocks mined in parallel are kept) that runs three spaces on one chain: a Native space, an Ethereum-compatible eSpace and a Shielded Space for private payments. It is in devnet and testnet, and its node and miner software is open source, written in Rust. MAZZE trades today as a token on Ethereum; on the native chain it is planned to pay fees and mining rewards.
Overall rating: 3/10.
Narratives: L1, PoW, DAG, EVM, Privacy.
Ecosystem: 1/10
- Devnet live; mainnet not confirmed
- Three spaces: Native, eSpace, Shielded (devnet)
- No named apps on the project site
- GitHub: 19 repos; code updated 2026-10-31
Nothing is live on a mainnet (rating guide: pre-mainnet 0-2); the baseline of 1 holds. Up: mainnet launch with live apps. Down: none, already at the floor of the guide's range.
Score history
Was 1 on 2024-07-28 (pre-mainnet); now 1 because the project is still devnet and testnet on 2026-11-08, so the baseline holds.
No apps or integrations named
The site names no apps, wallets or integrations; only a block explorer (mazzescan.io) and Uniswap are linked.
GitHub activity
GitHub org MazzeLabs: 50 followers, 19 repositories. Updated: mazze-rust-release 2026-10-31 (5 stars), docs 2026-10-20, mazze-agent 2026-03-21, mazze-explorer 2025-08-05. The release repo has 462 commits on master and no releases listed.
Utility: 3/10
- Today an ERC-20 token on Ethereum
- Planned: fees, mining rewards, storage bonding
- Shielded fees 100% burned (stated, devnet)
- Live on-chain use not verified
Planned uses belong to a native chain that is still devnet and testnet, and the token that trades is an ERC-20 on Ethereum; the rating guide scores mostly planned utility at 2-4. Up: mainnet with the token as gas and miner reward. Down: none identified.
Score history
Was 10 on 2024-07-28 (note: tx processing, storage bonding, miner rewards); now 3 because those uses belong to a native chain that is still devnet and testnet on 2026-11-08, and the token that trades is an ERC-20 on Ethereum.
Shielded fee burn
The site states that 100% of shielded fees are burned, in the Shielded Space that runs on devnet only.
Roadmap: 4/10
- Mainnet plan of Q3 2024 was missed
- Devnet live; testnet chain IDs 1990 and 1991
- Shielded Space: devnet, no activation date
- Roadmap page dates: gap
A mainnet date slipped by more than two years against real ongoing development, and no dated forward roadmap or audit is verified (the rating guide caps the score at 5 with no forward roadmap). Up: mainnet launch and a dated roadmap. Down: further slips.
Score history and missed mainnet date
Was 10 on 2024-07-28 (clear dates; milestones met); now 4 because the March 2024 press release planned a mainnet launch with a token swap bridge for Q3 2024, and on 2026-11-08 the site and docs show devnet and testnet only.
Roadmap: gap
The site links a Roadmap page (devnet to mainnet and Shielded Space) but lists no milestones or dates. A forward roadmap with dates is therefore not verified.
Delivered
Public code with recent activity (mazze-rust-release 2026-10-31), a devnet, a testnet and a Shielded Space on devnet. The 2024 plan also named privacy features (ZK proofs) for 2025; they are on devnet now.
Security
No audit was found on the site, the docs or the GitHub pages read on 2026-11-08.
Team: 2/10
- No team named on the site or the docs
- Press release of 2024-03-04 datelined Bucharest
- Contributors list on docs repo is empty
- No VCs stated (2024 press release)
The official channels show an evidenced absence of named people. Up: named, verifiable founders. Down: none identified.
No named team
Was 2 on 2024-07-28 (undoxxed); still 2: the site does not mention a team and the docs list no contributors or names (read 2026-11-08).
2024 press release
The 2024 press release was datelined Bucharest, Romania and said the project was built without venture capitalists. Founders are not named in what was read.
Unconfirmed third-party claim
One risk-rating site lists a doxxed team (July 2026); it could not be confirmed from any official page, so it is not used.
Social: 6/10
- X: 12.3k followers (carried from 2024-07-28)
- X handle @MazzeLabs; Discord and Telegram exist
- GitHub org: 50 followers
- Not re-measured; engagement not checked
Baseline kept because no current social data could be read; the rating is provisional here. Up: measured engagement near the benchmark. Down: quiet or empty channels once read.
Carried follower count
Carried from 2024-07-28 and not re-verified: 12.3k. Follower counts, engagement and the Phlanx comparison are not stated.
Channels and news
The site links X @MazzeLabs, Discord and Telegram. An X update post exists (accessed 2026-11-08). A news aggregator page (2026-09-25) shows no news articles about Mazze.
GitHub activity
GitHub activity is recent (2026-10-31).
Tokenomics: 10/10
- Max 4.9B; circulating 2.67B (54.5%)
- Total supply 4.84B
- Carried: 1-year vesting (2024); not re-verified
- Unlock schedule and contract control: unverified
Carried from the 2024 baseline with moderate circulation and no VC allocation stated; PROVISIONAL because the unlock schedule and contract control are unverified. Up: published allocations and a verified contract. Down: a team-controlled treasury or large unlocks once read.
Supply on 2026-11-08
Max 4,900,000,000; total 4,835,697,309; circulating 2,668,502,530 (54.5% of max).
Score history
Was 10 on 2024-07-28 (52% circulating; 1-year vesting; no VCs; inflation decreasing); carried at 10, not re-verified. The circulating share rose from about 52% to 54.5%, which fits the 2024 note, but no official allocation, vesting or emission figure is confirmed. The project site gives none.
Vesting timing
The 2024 note of a 1-year vesting would have ended by mid-2025 if it started in 2024; the start date is not stated.
Relationships: 1/10
- No partners named on the site
- Carried from 2024: none
- Uniswap is a trading venue, not a partner
No verified relationships. Up: named, confirmed integrations. Down: none identified.
No partners
Was 1 on 2024-07-28 (none); still 1: the site names no partners, and searches on 2026-11-08 found only the 2024 press release and price pages.
No investors stated
No investors were stated; the 2024 release said the project was built without VCs.
Exchanges: 1/10
- Uniswap V3 on Ethereum (MAZZE/WETH)
- CoinGecko: 1 exchange, 1 market
- 24h volume $1.80K (0.3%/MC)
- MEXC (2024) not on CoinGecko now
DEX-only per CoinGecko (rating guide: MEXC-only or DEX-only 1-2). Up: a centralised listing. Down: an inactive pool.
Score history and current venues
Was 2 on 2024-07-28 (MEXC, DEXs); now 1 because CoinGecko lists 1 exchange and 1 market, a Uniswap V3 MAZZE/WETH pool with about $74.63 of 24h volume and no trades in the last hours, and does not show MEXC. The site links only Uniswap.
Volume
Total 24h volume is $1,801.43, about 0.3% of the market cap (2026-11-08).
Earlier listings
MEXC listed MAZZE in 2024 (a MEXC announcement cited by CoinCarp) and Bilaxy is shown by older aggregator pages; neither is confirmed active today.
Notes
Mazze is a proof-of-work DAG Layer 1 with public code and a recently updated release repository (2026-10-31), but only a devnet and testnet are shown and a mainnet is not confirmed. The mainnet planned for Q3 2024 was missed. No team is named on the project site or docs, and no audit was found. The price is 97.8% below the all-time high of $0.01012121 (2024-04-10), the market cap is $601,012 and 24h volume is $1,801.43, with one venue left: Uniswap V3 on Ethereum. The Shielded Space (post-quantum privacy) is devnet only. The rating is provisional: Social, Tokenomics and Relationships are carried from the 2024-07-28 baseline, and the unlock schedule, contract control and any audit are unverified. Breaking news (last 90 days, 2026-08-10 to 2026-11-08): none found.
Positive findings
- Public code under GPL-3.0 with 462 commits; release repo updated 2026-10-31.
- A devnet and a testnet are live, including a Shielded Space on devnet.
- No VCs stated in the 2024 press release.
Material risks
- Devnet and testnet only; mainnet not confirmed, and the Q3 2024 mainnet plan was missed.
- Team not named on the project site or docs.
- Price 97.8% below the all-time high of $0.01012121; micro-cap with MC $601,012 and 24h volume $1,801.43.
- One venue left: a Uniswap V3 pool on Ethereum.
- No audit found.
- Breaking news (2026-08-10 to 2026-11-08): no hack, exploit, delisting, lawsuit or regulator action found.